  1. What is a snag?

    A snag is a fault in your recently renovated property. Most are cosmetic, things like poor plasterwork, paint runs, badly fitted doors or chipped tiles. Some are not, and those are the ones worth finding early.

  2. When should a snagging survey be done?

    Ideally in the first few days after you complete, while the builder's site team is still on the development. In our experience most customers book within one to five days after completion. If you have already moved in it makes little difference to the inspection itself.

  3. How long does it take?

    We take as long as the house needs. That depends on how it has been built, so it varies from one property to the next.

  4. Does my builder have to fix the snags?

    If your home came with a new build warranty, and most do, the first two years after legal completion are the builder's responsibility. NHBC's Buildmark is the most common, with Premier Guarantee and LABC working in a similar way. During that period the builder, not the warranty provider, is responsible for putting right anything that fails to meet the warranty standards. Report problems to your builder in writing and keep a record of everything.

    If you do not get a response within 30 days, or you are not happy with the builder's decision, you can ask NHBC for their resolution service. After two years the cover narrows to structural defects only, so it is worth checking your own policy documents.

  5. Are you independent of the developer?

    Yes. We are instructed by you, paid by you, and we report to you. Nobody else in the handover process is, which is the whole reason for having your own inspection.

  6. What does the price include?

    Every inspection covers the property inside and out. Thermal imaging and a drone survey can be added, and a re-snag can be booked separately once your builder says the work is finished. The full price list, and what affects it, is on our snagging survey cost page.

  7. What is a re-snag inspection?

    When your builder has completed our list, we make an appointment and come back to check every item has been done, done to a decent standard, and that nothing else was damaged along the way.

  8. What is thermal imaging, and do I need it?

    A thermal imaging camera shows what the eye cannot: cold spots, and areas behind walls and ceilings where insulation is missing or inadequate. Not every home needs it. It is worth considering if you have noticed cold areas, or if you want the insulation checked before the two year warranty period runs out.

  9. When will I get my report?

    The next day, in clear words the builder can act on.

  10. Is there a deposit?

    Yes. Once we confirm your booking, we ask for a £50 deposit to secure the date. The deposit is non-refundable and is taken off the final price. Bank transfer or cash preferred.

  11. Is it worth paying for a snagging survey?

    Yes, for most new builds. A builder signing a house off does not mean it is finished properly. One house we inspected in August 2026 had 77 faults. You get a clear list the builder has to work through while your home is under warranty, so the repairs cost you nothing. Many problems, such as missing insulation, poor sealing round windows or roof defects, are hard to spot without experience or the right equipment. Once the two year builder period ends, they become your problem.

  12. Can I do my own snagging survey?

    You can, and any check is better than none. Most buyers pick up the obvious things, like paint runs, chipped tiles and doors that stick. What they tend to miss is the work an inspector looks for every day: poor sealing round windows and doors, missing insulation, defects in the roof and brickwork, drainage and ventilation. A builder is also more likely to act on an independent report than on a list from the buyer. If you do it yourself, take your time, photograph everything and put it to the builder in writing.

  13. How long do I have to report snags?

    Your builder is normally responsible for putting right defects for the first two years after legal completion, under most new build warranties such as NHBC's Buildmark. The sooner you report snags the better, ideally before you complete or within the first few weeks, while the site team is still on the development. After two years the cover narrows to structural defects only, so anything not reported by then is usually yours to fix.

  14. What is a clerk of works, and what does MICWCI mean?

    A clerk of works is an independent inspector whose job is to check that building work is done properly and to the specification, on behalf of the client rather than the builder. MICWCI means Billy is a member of the Institute of Clerks of Works and Construction Inspectorate, the professional body for construction inspectors. Together with 37 years in building, construction and site management, it means your house is checked by someone who has spent a career making sure building work is done right.